Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Sep 01, 2022     Lower Forward mount brackets - (4 hours)       Category: Instrument Panel
Completed install of lower, forward support brackets for instrument panel at the lower radio rack. Temp installed terminal block at station 3 just below baggage floor for all power leads from both wings. Positive wires from wings (Nav lights, strobe lights, landing lights, pitot heat ) will terminate at this block. Positive power wires will come out of bottom of block to main/avionics bus. Same for grounds. I will use a terminal block for all ground wires from wings and run one common ground to firewall grounding block.


 